Run Daily on Weekdays at 7:30 PM | CronBase

cron expression Standard
$ 30 19 * * 1-5

Every weekday evening at half past seven

30
Minute
19
Hour
*
Day of Month
*
Month
1-5
Day of Week

* In a Nutshell

The cron expression 30 19 * * 1-5 runs Every weekday evening at half past seven. This schedule is ideal for tasks that need to run after business hours but before the end of the day. It ensures timely processing of daily reports, final system health checks, or data synchronization tasks without interfering with daytime operations or requiring immediate attention overnight.

* When to use this

Use 30 19 * * 1-5 when a recurring task needs to run Every weekday evening at half past seven. This schedule is commonly associated with daily schedules and report generation and weekday schedules workloads. It uses Standard (5-Field POSIX) syntax, supported by Unix cron daemons, cloud schedulers such as AWS EventBridge, and container orchestration platforms such as Kubernetes CronJob.

CronBase parses 30 19 * * 1-5 using a dialect-aware rules engine that identifies the Standard (5-Field POSIX) format, validates field structure against the Standard (5-Field POSIX) specification, and produces the translation above. Next run times are calculated by forward-scanning from the current UTC clock. Learn how CronBase works.

Platform Implementations

Bash

Prerequisites

Unix/Linux host with a cron daemon running (vixie-cron, cronie, or systemd-cron). The script at /usr/local/bin/run-task.sh must exist and be executable (chmod +x).

Configuration

Run crontab -e to open the crontab editor. Cron reads the server's local timezone; prefix with CRON_TZ=UTC before the expression to pin to UTC. Always redirect output with >> /var/log/cron-tasks.log 2>&1 to capture both stdout and stderr.

Gotchas

Cron jobs inherit a minimal PATH — use full binary paths or set PATH=/usr/local/sbin:/usr/local/bin:/usr/sbin:/usr/bin:/sbin:/bin at the top of the crontab. For sub-hourly schedules, add flock -n /tmp/run-task.lock before the command to skip overlapping runs if the previous execution is still running.

bash
# Add to crontab with: crontab -e
30 19 * * 1-5 /usr/local/bin/run-task.sh >> /var/log/cron-tasks.log 2>&1

Last verified:

Nodejs

Prerequisites

Node.js 18+ with node-cron installed (npm install node-cron). Add "type": "module" to package.json to use the import syntax shown above.

Configuration

Pass { timezone: 'UTC' } as the third argument to cron.schedule(). Without this option the schedule uses the Node.js process timezone, which shifts during DST transitions when servers are not pinned to UTC.

Gotchas

node-cron uses standard 5-field cron syntax — not Quartz 6-field. If your job runs longer than the schedule interval the next trigger fires while the previous is still executing. Use a boolean guard or a queue to skip concurrent runs rather than relying on the scheduler to enforce it.

nodejs
import cron from 'node-cron';

cron.schedule('30 19 * * 1-5', async () => {
  console.log('[cron] running at', new Date().toISOString());
  // your task logic here
}, { timezone: 'UTC' });

Last verified:

Python

Prerequisites

Python 3.8+ with apscheduler installed (pip install apscheduler). For Python 3.12+ use apscheduler>=3.10.

Configuration

CronTrigger.from_crontab() accepts a standard 5-field cron string. Always pass timezone='UTC' to both the BlockingScheduler constructor and the trigger to ensure consistent scheduling regardless of the server's locale.

Gotchas

BlockingScheduler.start() blocks the calling thread indefinitely. For a web application, use BackgroundScheduler instead and call scheduler.start() at application startup. APScheduler logs missed fires if the process is stopped and restarted — configure misfire_grace_time (in seconds) to control how late a missed job is allowed to run.

python
from apscheduler.schedulers.blocking import BlockingScheduler
from apscheduler.triggers.cron import CronTrigger

scheduler = BlockingScheduler(timezone='UTC')

@scheduler.scheduled_job(
    CronTrigger.from_crontab('30 19 * * 1-5', timezone='UTC')
)
def run_task() -> None:
    print('task running')
    # your task logic here

scheduler.start()

Last verified:

Golang

Prerequisites

Go 1.18+ and github.com/robfig/cron/v3 (go get github.com/robfig/cron/v3).

Configuration

Always create the scheduler with cron.New(cron.WithLocation(time.UTC)). Without WithLocation, the library defaults to the server's local timezone. Call c.Start() to begin the scheduler, then block with select {} to keep the process alive.

Gotchas

robfig/cron v3 uses standard 5-field cron expressions by default. To add second-level precision (6 fields), pass cron.WithSeconds() to cron.New() — but this changes field positions, so never mix syntaxes in the same scheduler. Always check the error returned by c.AddFunc() — a malformed expression is silently ignored without it.

golang
package main

import (
	"fmt"
	"time"

	"github.com/robfig/cron/v3"
)

func main() {
	c := cron.New(cron.WithLocation(time.UTC))
	_, err := c.AddFunc("30 19 * * 1-5", func() {
		fmt.Println("task running at", time.Now().UTC())
		// your task logic here
	})
	if err != nil {
		panic(err)
	}
	c.Start()
	defer c.Stop()
	select {}
}

Last verified:

Java

Prerequisites

Spring Boot 2.7+ (or Spring Framework 5.3+) with spring-context on the classpath. Annotate your @SpringBootApplication class with @EnableScheduling — without it, @Scheduled methods are silently ignored.

Configuration

Spring @Scheduled uses a 6-field Quartz-style expression: [sec] [min] [hr] [dom] [mon] [dow]. The expression 0 30 19 ? * 1-5 is derived from 30 19 * * 1-5 — a leading 0 is prepended for the seconds field, and ? replaces the unconstrained day field.

Gotchas

Standard Unix cron has 5 fields; Spring requires 6. Pasting a 5-field expression directly into @Scheduled shifts every field by one and the job misfires silently. Use ? for either dom or dow — Quartz does not allow both to be *.

java
import org.springframework.scheduling.annotation.Scheduled;
import org.springframework.stereotype.Component;

@Component
public class ScheduledTask {

    @Scheduled(cron = "0 30 19 ? * 1-5")
    public void runTask() {
        System.out.println("task running at: " + java.time.Instant.now());
        // your task logic here
    }
}

Last verified:

Kubernetes

Prerequisites

Kubernetes 1.21+ (CronJob API is GA). kubectl configured with cluster access. Container image must be pullable from within the cluster.

Configuration

Apply with kubectl apply -f cronjob.yaml. Check status with kubectl get cronjobs and inspect run history with kubectl get jobs. concurrencyPolicy: Allow is set because this schedule fires infrequently — parallel runs are acceptable.

Gotchas

Without startingDeadlineSeconds, a missed job (e.g., due to cluster downtime) triggers as soon as the controller recovers. Kubernetes 1.25+ supports timeZone: UTC in the spec to avoid timezone ambiguity. Keep successfulJobsHistoryLimit and failedJobsHistoryLimit low to avoid accumulating stale Job objects in the cluster.

kubernetes
apiVersion: batch/v1
kind: CronJob
metadata:
  name: scheduled-task
spec:
  schedule: "30 19 * * 1-5"
  concurrencyPolicy: Allow
  jobTemplate:
    spec:
      template:
        spec:
          restartPolicy: OnFailure
          containers:
          - name: task
            image: alpine:3.19
            command: ["/bin/sh", "-c", "echo 'task running'"]

Last verified:

AWS EventBridge Equivalent

Standard cron expressions often need conversion for AWS EventBridge schedules.

EventBridge Rule
cron(30 19 ? * 1-5 *)

Frequently Asked Questions

What specific tasks does the `30 19 * * 1-5` cron schedule handle?

This schedule triggers at 7:30 PM on Mondays, Tuesdays, Wednesdays, Thursdays, and Fridays. It's commonly used for tasks like generating end-of-day reports, performing final system status checks, or initiating data backups after the main workday.

How does this schedule behave during Daylight Saving Time changes?

The job will run at 7:30 PM according to the server's local time. When Daylight Saving Time starts or ends, the job's execution time relative to Coordinated Universal Time (UTC) may shift by one hour.

How can I verify that my job is running successfully with this schedule?

Confirm the job executed by checking its logs for successful completion messages around 7:30 PM on weekdays. You can also set up alerts for job failures to be notified immediately if it doesn't run as expected.

What potential issues should I be aware of with this schedule?

A key consideration is ensuring the task completes before the next scheduled run, especially if it's a long-running process. If the previous day's job (e.g., Friday's) finishes late, it could conflict with Monday's run.

What is a common variation of this weekday evening schedule?

A frequent alternative is to run the task slightly later, for instance, at 8:00 PM, to allow for more processing time. This is useful if tasks tend to consistently run longer than anticipated.

More schedules like this

Explore Daily Schedules →

* Try any expression

Standard, Quartz, AWS EventBridge, Jenkins, named schedules (@daily, @hourly…)

* Keep Exploring

Related expressions you might need