Run Job on November 11th at 10:41 AM | CronBase

cron expression Quartz
$ 0 41 10 11 11 ?

On November eleventh at ten forty-one AM

0
Second
41
Minute
10
Hour
11
Day of Month
11
Month
?
Day of Week

* In a Nutshell

The cron expression 0 41 10 11 11 ? runs On November eleventh at ten forty-one AM. This specific yearly cadence is crucial for time-sensitive, single-occurrence annual tasks. Think critical software license renewals or anniversary-based customer notifications that must execute on a precise date and time. Missing this exact moment could lead to service disruptions or missed business opportunities.

* When to use this

Use 0 41 10 11 11 ? when a recurring task needs to run On November eleventh at ten forty-one AM. This schedule is commonly associated with certificate renewal and monthly schedules and report generation workloads. It uses Quartz Scheduler (6–7 Fields) syntax, supported by Unix cron daemons, cloud schedulers such as AWS EventBridge, and container orchestration platforms such as Kubernetes CronJob.

CronBase parses 0 41 10 11 11 ? using a dialect-aware rules engine that identifies the Quartz Scheduler (6–7 Fields) format, validates field structure against the Quartz Scheduler (6–7 Fields) specification, and produces the translation above. Next run times are calculated by forward-scanning from the current UTC clock. Learn how CronBase works.

Platform Implementations

Bash

Prerequisites

Unix/Linux host with a cron daemon running (vixie-cron, cronie, or systemd-cron). The script at /usr/local/bin/run-task.sh must exist and be executable (chmod +x).

Configuration

Run crontab -e to open the crontab editor. Cron reads the server's local timezone; prefix with CRON_TZ=UTC before the expression to pin to UTC. Always redirect output with >> /var/log/cron-tasks.log 2>&1 to capture both stdout and stderr.

Gotchas

Cron jobs inherit a minimal PATH — use full binary paths or set PATH=/usr/local/sbin:/usr/local/bin:/usr/sbin:/usr/bin:/sbin:/bin at the top of the crontab. For sub-hourly schedules, add flock -n /tmp/run-task.lock before the command to skip overlapping runs if the previous execution is still running.

bash
# Add to crontab with: crontab -e
41 10 11 11 * /usr/local/bin/run-task.sh >> /var/log/cron-tasks.log 2>&1

Last verified:

Nodejs

Prerequisites

Node.js 18+ with node-cron installed (npm install node-cron). Add "type": "module" to package.json to use the import syntax shown above.

Configuration

Pass { timezone: 'UTC' } as the third argument to cron.schedule(). Without this option the schedule uses the Node.js process timezone, which shifts during DST transitions when servers are not pinned to UTC.

Gotchas

node-cron uses standard 5-field cron syntax — not Quartz 6-field. If your job runs longer than the schedule interval the next trigger fires while the previous is still executing. Use a boolean guard or a queue to skip concurrent runs rather than relying on the scheduler to enforce it.

nodejs
import cron from 'node-cron';

cron.schedule('41 10 11 11 *', async () => {
  console.log('[cron] running at', new Date().toISOString());
  // your task logic here
}, { timezone: 'UTC' });

Last verified:

Python

Prerequisites

Python 3.8+ with apscheduler installed (pip install apscheduler). For Python 3.12+ use apscheduler>=3.10.

Configuration

CronTrigger.from_crontab() accepts a standard 5-field cron string. Always pass timezone='UTC' to both the BlockingScheduler constructor and the trigger to ensure consistent scheduling regardless of the server's locale.

Gotchas

BlockingScheduler.start() blocks the calling thread indefinitely. For a web application, use BackgroundScheduler instead and call scheduler.start() at application startup. APScheduler logs missed fires if the process is stopped and restarted — configure misfire_grace_time (in seconds) to control how late a missed job is allowed to run.

python
from apscheduler.schedulers.blocking import BlockingScheduler
from apscheduler.triggers.cron import CronTrigger

scheduler = BlockingScheduler(timezone='UTC')

@scheduler.scheduled_job(
    CronTrigger.from_crontab('41 10 11 11 *', timezone='UTC')
)
def run_task() -> None:
    print('task running')
    # your task logic here

scheduler.start()

Last verified:

Golang

Prerequisites

Go 1.18+ and github.com/robfig/cron/v3 (go get github.com/robfig/cron/v3).

Configuration

Always create the scheduler with cron.New(cron.WithLocation(time.UTC)). Without WithLocation, the library defaults to the server's local timezone. Call c.Start() to begin the scheduler, then block with select {} to keep the process alive.

Gotchas

robfig/cron v3 uses standard 5-field cron expressions by default. To add second-level precision (6 fields), pass cron.WithSeconds() to cron.New() — but this changes field positions, so never mix syntaxes in the same scheduler. Always check the error returned by c.AddFunc() — a malformed expression is silently ignored without it.

golang
package main

import (
	"fmt"
	"time"

	"github.com/robfig/cron/v3"
)

func main() {
	c := cron.New(cron.WithLocation(time.UTC))
	_, err := c.AddFunc("41 10 11 11 *", func() {
		fmt.Println("task running at", time.Now().UTC())
		// your task logic here
	})
	if err != nil {
		panic(err)
	}
	c.Start()
	defer c.Stop()
	select {}
}

Last verified:

Java

Prerequisites

Spring Boot 2.7+ (or Spring Framework 5.3+) with spring-context on the classpath. Annotate your @SpringBootApplication class with @EnableScheduling — without it, @Scheduled methods are silently ignored.

Configuration

Spring @Scheduled uses a 6-field Quartz-style expression: [sec] [min] [hr] [dom] [mon] [dow]. The expression 0 41 10 11 11 ? is derived from 0 41 10 11 11 ? — a leading 0 is prepended for the seconds field, and ? replaces the unconstrained day field.

Gotchas

Standard Unix cron has 5 fields; Spring requires 6. Pasting a 5-field expression directly into @Scheduled shifts every field by one and the job misfires silently. Use ? for either dom or dow — Quartz does not allow both to be *.

java
import org.springframework.scheduling.annotation.Scheduled;
import org.springframework.stereotype.Component;

@Component
public class ScheduledTask {

    @Scheduled(cron = "0 41 10 11 11 ?")
    public void runTask() {
        System.out.println("task running at: " + java.time.Instant.now());
        // your task logic here
    }
}

Last verified:

Kubernetes

Prerequisites

Kubernetes 1.21+ (CronJob API is GA). kubectl configured with cluster access. Container image must be pullable from within the cluster.

Configuration

Apply with kubectl apply -f cronjob.yaml. Check status with kubectl get cronjobs and inspect run history with kubectl get jobs. concurrencyPolicy: Allow is set because this schedule fires infrequently — parallel runs are acceptable.

Gotchas

Without startingDeadlineSeconds, a missed job (e.g., due to cluster downtime) triggers as soon as the controller recovers. Kubernetes 1.25+ supports timeZone: UTC in the spec to avoid timezone ambiguity. Keep successfulJobsHistoryLimit and failedJobsHistoryLimit low to avoid accumulating stale Job objects in the cluster.

kubernetes
apiVersion: batch/v1
kind: CronJob
metadata:
  name: scheduled-task
spec:
  schedule: "41 10 11 11 *"
  concurrencyPolicy: Allow
  jobTemplate:
    spec:
      template:
        spec:
          restartPolicy: OnFailure
          containers:
          - name: task
            image: alpine:3.19
            command: ["/bin/sh", "-c", "echo 'task running'"]

Last verified:

Frequently Asked Questions

What specific day and time does this schedule execute?

This schedule is set to run on the eleventh day of November, at precisely ten forty-one AM. It is a fixed point in time each year.

How does this schedule handle time zone or daylight saving changes?

The execution time is based on the server's or system's configured time zone. Daylight saving time adjustments may cause the effective execution time to shift by an hour during the transition periods.

How can I verify that this schedule has executed correctly?

You can check your system's job logs or audit trails for entries corresponding to the exact execution time and date. Successful completion logs should indicate the task ran as expected.

What potential issues might arise with this yearly schedule?

A key consideration is the specific date. If November eleventh falls on a weekend or holiday that your system is not designed to handle for processing, it might lead to an unexpected delay or an error if not managed.

What is a common alternative or variant for this schedule?

A common variant might be to schedule an event for the same day but at a different hour, such as early morning to ensure it completes before business hours begin.

More schedules like this

Explore Certificate Renewal →

* Try any expression

Standard, Quartz, AWS EventBridge, Jenkins, named schedules (@daily, @hourly…)

* Keep Exploring

Related expressions you might need