Run Monthly Task on November 23rd at 11 AM | CronBase

cron expression Quartz
$ 0 11 23 11 11 ?

On November 23rd at 11 AM, once a year

0
Second
11
Minute
23
Hour
11
Day of Month
11
Month
?
Day of Week

* In a Nutshell

The cron expression 0 11 23 11 11 ? runs On November 23rd at 11 AM, once a year. This specific yearly cadence is crucial for tasks that must align with annual cycles, such as end-of-year financial reporting preparation, specific compliance checks that are only valid for a particular period, or annual system maintenance windows that cannot be postponed. Missing this single execution could lead to significant delays or failures in critical business processes.

* When to use this

Use 0 11 23 11 11 ? when a recurring task needs to run On November 23rd at 11 AM, once a year. This schedule is commonly associated with maintenance window and monthly schedules and report generation workloads. It uses Quartz Scheduler (6–7 Fields) syntax, supported by Unix cron daemons, cloud schedulers such as AWS EventBridge, and container orchestration platforms such as Kubernetes CronJob.

CronBase parses 0 11 23 11 11 ? using a dialect-aware rules engine that identifies the Quartz Scheduler (6–7 Fields) format, validates field structure against the Quartz Scheduler (6–7 Fields) specification, and produces the translation above. Next run times are calculated by forward-scanning from the current UTC clock. Learn how CronBase works.

Platform Implementations

Bash

Prerequisites

Unix/Linux host with a cron daemon running (vixie-cron, cronie, or systemd-cron). The script at /usr/local/bin/run-task.sh must exist and be executable (chmod +x).

Configuration

Run crontab -e to open the crontab editor. Cron reads the server's local timezone; prefix with CRON_TZ=UTC before the expression to pin to UTC. Always redirect output with >> /var/log/cron-tasks.log 2>&1 to capture both stdout and stderr.

Gotchas

Cron jobs inherit a minimal PATH — use full binary paths or set PATH=/usr/local/sbin:/usr/local/bin:/usr/sbin:/usr/bin:/sbin:/bin at the top of the crontab. For sub-hourly schedules, add flock -n /tmp/run-task.lock before the command to skip overlapping runs if the previous execution is still running.

bash
# Add to crontab with: crontab -e
11 23 11 11 * /usr/local/bin/run-task.sh >> /var/log/cron-tasks.log 2>&1

Last verified:

Nodejs

Prerequisites

Node.js 18+ with node-cron installed (npm install node-cron). Add "type": "module" to package.json to use the import syntax shown above.

Configuration

Pass { timezone: 'UTC' } as the third argument to cron.schedule(). Without this option the schedule uses the Node.js process timezone, which shifts during DST transitions when servers are not pinned to UTC.

Gotchas

node-cron uses standard 5-field cron syntax — not Quartz 6-field. If your job runs longer than the schedule interval the next trigger fires while the previous is still executing. Use a boolean guard or a queue to skip concurrent runs rather than relying on the scheduler to enforce it.

nodejs
import cron from 'node-cron';

cron.schedule('11 23 11 11 *', async () => {
  console.log('[cron] running at', new Date().toISOString());
  // your task logic here
}, { timezone: 'UTC' });

Last verified:

Python

Prerequisites

Python 3.8+ with apscheduler installed (pip install apscheduler). For Python 3.12+ use apscheduler>=3.10.

Configuration

CronTrigger.from_crontab() accepts a standard 5-field cron string. Always pass timezone='UTC' to both the BlockingScheduler constructor and the trigger to ensure consistent scheduling regardless of the server's locale.

Gotchas

BlockingScheduler.start() blocks the calling thread indefinitely. For a web application, use BackgroundScheduler instead and call scheduler.start() at application startup. APScheduler logs missed fires if the process is stopped and restarted — configure misfire_grace_time (in seconds) to control how late a missed job is allowed to run.

python
from apscheduler.schedulers.blocking import BlockingScheduler
from apscheduler.triggers.cron import CronTrigger

scheduler = BlockingScheduler(timezone='UTC')

@scheduler.scheduled_job(
    CronTrigger.from_crontab('11 23 11 11 *', timezone='UTC')
)
def run_task() -> None:
    print('task running')
    # your task logic here

scheduler.start()

Last verified:

Golang

Prerequisites

Go 1.18+ and github.com/robfig/cron/v3 (go get github.com/robfig/cron/v3).

Configuration

Always create the scheduler with cron.New(cron.WithLocation(time.UTC)). Without WithLocation, the library defaults to the server's local timezone. Call c.Start() to begin the scheduler, then block with select {} to keep the process alive.

Gotchas

robfig/cron v3 uses standard 5-field cron expressions by default. To add second-level precision (6 fields), pass cron.WithSeconds() to cron.New() — but this changes field positions, so never mix syntaxes in the same scheduler. Always check the error returned by c.AddFunc() — a malformed expression is silently ignored without it.

golang
package main

import (
	"fmt"
	"time"

	"github.com/robfig/cron/v3"
)

func main() {
	c := cron.New(cron.WithLocation(time.UTC))
	_, err := c.AddFunc("11 23 11 11 *", func() {
		fmt.Println("task running at", time.Now().UTC())
		// your task logic here
	})
	if err != nil {
		panic(err)
	}
	c.Start()
	defer c.Stop()
	select {}
}

Last verified:

Java

Prerequisites

Spring Boot 2.7+ (or Spring Framework 5.3+) with spring-context on the classpath. Annotate your @SpringBootApplication class with @EnableScheduling — without it, @Scheduled methods are silently ignored.

Configuration

Spring @Scheduled uses a 6-field Quartz-style expression: [sec] [min] [hr] [dom] [mon] [dow]. The expression 0 11 23 11 11 ? is derived from 0 11 23 11 11 ? — a leading 0 is prepended for the seconds field, and ? replaces the unconstrained day field.

Gotchas

Standard Unix cron has 5 fields; Spring requires 6. Pasting a 5-field expression directly into @Scheduled shifts every field by one and the job misfires silently. Use ? for either dom or dow — Quartz does not allow both to be *.

java
import org.springframework.scheduling.annotation.Scheduled;
import org.springframework.stereotype.Component;

@Component
public class ScheduledTask {

    @Scheduled(cron = "0 11 23 11 11 ?")
    public void runTask() {
        System.out.println("task running at: " + java.time.Instant.now());
        // your task logic here
    }
}

Last verified:

Kubernetes

Prerequisites

Kubernetes 1.21+ (CronJob API is GA). kubectl configured with cluster access. Container image must be pullable from within the cluster.

Configuration

Apply with kubectl apply -f cronjob.yaml. Check status with kubectl get cronjobs and inspect run history with kubectl get jobs. concurrencyPolicy: Allow is set because this schedule fires infrequently — parallel runs are acceptable.

Gotchas

Without startingDeadlineSeconds, a missed job (e.g., due to cluster downtime) triggers as soon as the controller recovers. Kubernetes 1.25+ supports timeZone: UTC in the spec to avoid timezone ambiguity. Keep successfulJobsHistoryLimit and failedJobsHistoryLimit low to avoid accumulating stale Job objects in the cluster.

kubernetes
apiVersion: batch/v1
kind: CronJob
metadata:
  name: scheduled-task
spec:
  schedule: "11 23 11 11 *"
  concurrencyPolicy: Allow
  jobTemplate:
    spec:
      template:
        spec:
          restartPolicy: OnFailure
          containers:
          - name: task
            image: alpine:3.19
            command: ["/bin/sh", "-c", "echo 'task running'"]

Last verified:

Frequently Asked Questions

What specific date and time does this cron expression trigger?

This cron expression is set to trigger precisely on the 23rd day of November, at 11 AM. It is designed to run only once a year on this exact date and time.

How does this schedule handle Daylight Saving Time (DST) changes?

This schedule is tied to a specific calendar date and time. If a timezone observes Daylight Saving Time changes that affect the 11 AM hour on November 23rd, the job will run according to the local time observed on that day, potentially shifting relative to Coordinated Universal Time.

How can I verify that this cron job ran successfully on the scheduled date?

You can verify the successful execution by checking the job's logs or monitoring system for entries corresponding to the date November 23rd and the time 11 AM. Any associated output files or database records updated by the job will also serve as confirmation.

What is a potential gotcha for a once-a-year schedule?

A common gotcha for a once-a-year schedule is forgetting to update or re-enable it after its execution, or assuming it will automatically re-arm for the next year if not configured for recurrence. Always confirm the job's re-arm behavior.

Are there common variations for this type of annual schedule?

A common variation might involve scheduling for the first day of the month or the last day of the month, rather than a fixed date, to align with financial closing periods or similar monthly business cycles.

More schedules like this

Explore Maintenance Window →

* Try any expression

Standard, Quartz, AWS EventBridge, Jenkins, named schedules (@daily, @hourly…)

* Keep Exploring

Related expressions you might need