Execute on December 31st at 2:44 AM | CronBase

cron expression Standard
$ 44 2 31 12 *

On December 31st at 2:44 AM every year

44
Minute
2
Hour
31
Day of Month
12
Month
*
Day of Week

* In a Nutshell

The cron expression 44 2 31 12 * runs On December 31st at 2:44 AM every year. This specific annual cadence is crucial for tasks that must align with the fiscal or calendar year-end. Running critical processes precisely at this time ensures all year-end reporting and system cleanups are completed before the new year begins, preventing data discrepancies and operational bottlenecks.

* When to use this

Use 44 2 31 12 * when a recurring task needs to run On December 31st at 2:44 AM every year. This schedule is commonly associated with end of month and monthly schedules and report generation workloads. It uses Standard (5-Field POSIX) syntax, supported by Unix cron daemons, cloud schedulers such as AWS EventBridge, and container orchestration platforms such as Kubernetes CronJob.

CronBase parses 44 2 31 12 * using a dialect-aware rules engine that identifies the Standard (5-Field POSIX) format, validates field structure against the Standard (5-Field POSIX) specification, and produces the translation above. Next run times are calculated by forward-scanning from the current UTC clock. Learn how CronBase works.

Platform Implementations

Bash

Prerequisites

Unix/Linux host with a cron daemon running (vixie-cron, cronie, or systemd-cron). The script at /usr/local/bin/run-task.sh must exist and be executable (chmod +x).

Configuration

Run crontab -e to open the crontab editor. Cron reads the server's local timezone; prefix with CRON_TZ=UTC before the expression to pin to UTC. Always redirect output with >> /var/log/cron-tasks.log 2>&1 to capture both stdout and stderr.

Gotchas

Cron jobs inherit a minimal PATH — use full binary paths or set PATH=/usr/local/sbin:/usr/local/bin:/usr/sbin:/usr/bin:/sbin:/bin at the top of the crontab. For sub-hourly schedules, add flock -n /tmp/run-task.lock before the command to skip overlapping runs if the previous execution is still running.

bash
# Add to crontab with: crontab -e
44 2 31 12 * /usr/local/bin/run-task.sh >> /var/log/cron-tasks.log 2>&1

Last verified:

Nodejs

Prerequisites

Node.js 18+ with node-cron installed (npm install node-cron). Add "type": "module" to package.json to use the import syntax shown above.

Configuration

Pass { timezone: 'UTC' } as the third argument to cron.schedule(). Without this option the schedule uses the Node.js process timezone, which shifts during DST transitions when servers are not pinned to UTC.

Gotchas

node-cron uses standard 5-field cron syntax — not Quartz 6-field. If your job runs longer than the schedule interval the next trigger fires while the previous is still executing. Use a boolean guard or a queue to skip concurrent runs rather than relying on the scheduler to enforce it.

nodejs
import cron from 'node-cron';

cron.schedule('44 2 31 12 *', async () => {
  console.log('[cron] running at', new Date().toISOString());
  // your task logic here
}, { timezone: 'UTC' });

Last verified:

Python

Prerequisites

Python 3.8+ with apscheduler installed (pip install apscheduler). For Python 3.12+ use apscheduler>=3.10.

Configuration

CronTrigger.from_crontab() accepts a standard 5-field cron string. Always pass timezone='UTC' to both the BlockingScheduler constructor and the trigger to ensure consistent scheduling regardless of the server's locale.

Gotchas

BlockingScheduler.start() blocks the calling thread indefinitely. For a web application, use BackgroundScheduler instead and call scheduler.start() at application startup. APScheduler logs missed fires if the process is stopped and restarted — configure misfire_grace_time (in seconds) to control how late a missed job is allowed to run.

python
from apscheduler.schedulers.blocking import BlockingScheduler
from apscheduler.triggers.cron import CronTrigger

scheduler = BlockingScheduler(timezone='UTC')

@scheduler.scheduled_job(
    CronTrigger.from_crontab('44 2 31 12 *', timezone='UTC')
)
def run_task() -> None:
    print('task running')
    # your task logic here

scheduler.start()

Last verified:

Golang

Prerequisites

Go 1.18+ and github.com/robfig/cron/v3 (go get github.com/robfig/cron/v3).

Configuration

Always create the scheduler with cron.New(cron.WithLocation(time.UTC)). Without WithLocation, the library defaults to the server's local timezone. Call c.Start() to begin the scheduler, then block with select {} to keep the process alive.

Gotchas

robfig/cron v3 uses standard 5-field cron expressions by default. To add second-level precision (6 fields), pass cron.WithSeconds() to cron.New() — but this changes field positions, so never mix syntaxes in the same scheduler. Always check the error returned by c.AddFunc() — a malformed expression is silently ignored without it.

golang
package main

import (
	"fmt"
	"time"

	"github.com/robfig/cron/v3"
)

func main() {
	c := cron.New(cron.WithLocation(time.UTC))
	_, err := c.AddFunc("44 2 31 12 *", func() {
		fmt.Println("task running at", time.Now().UTC())
		// your task logic here
	})
	if err != nil {
		panic(err)
	}
	c.Start()
	defer c.Stop()
	select {}
}

Last verified:

Java

Prerequisites

Spring Boot 2.7+ (or Spring Framework 5.3+) with spring-context on the classpath. Annotate your @SpringBootApplication class with @EnableScheduling — without it, @Scheduled methods are silently ignored.

Configuration

Spring @Scheduled uses a 6-field Quartz-style expression: [sec] [min] [hr] [dom] [mon] [dow]. The expression 0 44 2 31 12 ? is derived from 44 2 31 12 * — a leading 0 is prepended for the seconds field, and ? replaces the unconstrained day field.

Gotchas

Standard Unix cron has 5 fields; Spring requires 6. Pasting a 5-field expression directly into @Scheduled shifts every field by one and the job misfires silently. Use ? for either dom or dow — Quartz does not allow both to be *.

java
import org.springframework.scheduling.annotation.Scheduled;
import org.springframework.stereotype.Component;

@Component
public class ScheduledTask {

    @Scheduled(cron = "0 44 2 31 12 ?")
    public void runTask() {
        System.out.println("task running at: " + java.time.Instant.now());
        // your task logic here
    }
}

Last verified:

Kubernetes

Prerequisites

Kubernetes 1.21+ (CronJob API is GA). kubectl configured with cluster access. Container image must be pullable from within the cluster.

Configuration

Apply with kubectl apply -f cronjob.yaml. Check status with kubectl get cronjobs and inspect run history with kubectl get jobs. concurrencyPolicy: Allow is set because this schedule fires infrequently — parallel runs are acceptable.

Gotchas

Without startingDeadlineSeconds, a missed job (e.g., due to cluster downtime) triggers as soon as the controller recovers. Kubernetes 1.25+ supports timeZone: UTC in the spec to avoid timezone ambiguity. Keep successfulJobsHistoryLimit and failedJobsHistoryLimit low to avoid accumulating stale Job objects in the cluster.

kubernetes
apiVersion: batch/v1
kind: CronJob
metadata:
  name: scheduled-task
spec:
  schedule: "44 2 31 12 *"
  concurrencyPolicy: Allow
  jobTemplate:
    spec:
      template:
        spec:
          restartPolicy: OnFailure
          containers:
          - name: task
            image: alpine:3.19
            command: ["/bin/sh", "-c", "echo 'task running'"]

Last verified:

AWS EventBridge Equivalent

Standard cron expressions often need conversion for AWS EventBridge schedules.

EventBridge Rule
cron(44 2 31 12 ? *)

Frequently Asked Questions

What does the `44 2 31 12 *` cron expression do?

This expression is configured to trigger an action precisely at 2:44 AM on December 31st each year, marking a specific point in time annually for scheduled tasks.

How does timezone and Daylight Saving Time affect this schedule?

The schedule runs based on the server's configured timezone. During Daylight Saving Time transitions, the exact clock time might shift relative to UTC, so it's important to confirm the server's timezone settings are appropriate for your needs.

How can I verify that a job scheduled with this expression is running correctly?

Monitor job logs for successful completion at the scheduled time. You can also set up alerting to notify you if the job fails or does not run. Checking system activity logs around December 31st at 2:44 AM will show execution entries.

What is a common pitfall or gotcha with this annual schedule?

A critical gotcha is ensuring that the systems and dependencies required for the task are operational and correctly configured for the new year ahead. Forgetting to update configurations or dependencies for the next year can lead to unexpected failures.

What is a common variation for annual schedules like this?

A common variation involves scheduling for the first day of the new year instead of the last day of the previous one, perhaps for initial setup tasks. Alternatively, a task might run at a slightly different time to avoid peak load.

More schedules like this

Explore End of Month →

* Try any expression

Standard, Quartz, AWS EventBridge, Jenkins, named schedules (@daily, @hourly…)

* Keep Exploring

Related expressions you might need